Home / Blog / Upcoming Dholera Projects 2026-2035

Upcoming Dholera Projects 2026-2035

Dholera upcoming projects
Last verified July 16, 2026 - AskDholera research
Dholera SIR master plan and mega-projects
Airport - Semiconductor fab - Expressway - Solar park - Rail - Townships

Dholera Special Investment Region (Dholera SIR) is India's first greenfield smart city and the flagship node of the Delhi-Mumbai Industrial Corridor (DMIC), planned across roughly 920 sq km of Dholera taluka in Ahmedabad district, Gujarat, and implemented by the special-purpose vehicle Dholera Industrial City Development Limited (DICDL). Between 2026 and 2035, a cluster of anchor projects moves from construction into operation: the Dholera International Airport near Navagam, the Ahmedabad-Dholera Expressway, the Tata Electronics and PSMC semiconductor fab, the Dholera Solar Park, a Bhimnath rail link tied to the Western Dedicated Freight Corridor, and a planned metro/MRTS corridor. This guide lays out each project with a dated status and its source, so you can separate what is built from what is reported or planned.

At a glance: every major Dholera project

ProjectCategoryStatusExpected phase
Dholera International AirportConnectivityUnder construction / trialsPhase 1 operations 2026
Ahmedabad-Dholera ExpresswayConnectivityReported operationalOpen 2026, 8-lane later
Metro / MRTS corridorConnectivityPlanned2028-2035
Bhimnath-Dholera rail & DFC linkConnectivityUnder construction / survey2027-2030
Tata Electronics-PSMC semiconductor fabIndustrialUnder constructionTrial output 2026-2027
DICDL activation-area industrial zoneIndustrialOngoing2026-2030
Dholera Solar ParkEnergyOngoing (Phase 1 live)Scale-up to 2030
Residential townshipsUrbanPlanned / early build2026-2035
Central business district & ABCD hubUrbanOngoing2026-2032

Status labels are dated snapshots. Several figures below are reported or planned and can change; verify current status before you act.

Connectivity projects

1. Dholera International Airport

Under construction
Dholera International Airport, Navagam - terminal and runway

2. Ahmedabad-Dholera Expressway

Reported operational
Ahmedabad-Dholera Expressway - access-controlled corridor

3. Metro / MRTS corridor

Planned
Planned Ahmedabad-Dholera MRTS / metro corridor

4. Bhimnath-Dholera rail link & Dedicated Freight Corridor

Under construction / survey
Bhimnath rail terminal linking Dholera SIR to the Western DFC

Industrial projects

5. Tata Electronics-PSMC semiconductor fab

Under construction
Tata Electronics semiconductor fab campus, Dholera

6. DICDL activation-area industrial zone

Ongoing
Dholera SIR activation-area industrial trunk infrastructure

Energy projects

7. Dholera Solar Park

Ongoing (Phase 1 live)
Dholera Solar Park - ultra-mega solar generation

Urban projects

8. Residential townships

Planned / early build
Planned Dholera SIR residential townships

9. Central business district & ABCD hub

Ongoing
ABCD building and central business district, Dholera SIR

Phase-wise timeline (2025-2035)

2025-2027
Airport Phase 1 civil work and trials; Ahmedabad-Dholera Expressway open; semiconductor fab construction and early trial production; activation-area trunk infrastructure and the ABCD/CBD core; Bhimnath rail survey and works begin. Reported and dated status above.
2028-2030
Solar Park capacity scaling toward its planned target; Bhimnath-DFC rail link maturing; semiconductor commercial output ramping; early residential townships and commercial plots absorbing tenants; metro/MRTS planning advancing.
2031-2035
Expressway widening toward eight lanes; airport later phases; deeper township and CBD build-out; metro/MRTS corridor targeted for delivery; broader SIR expansion beyond the initial activation area. Long-range and planned.

This timeline groups projects by reported and planned phases. Exact dates shift with approvals, funding and execution, so treat later years as directional.

Frequently asked questions

Is Dholera airport operational yet?

Not for regular commercial flights as of July 2026. Phase 1 civil work is reported complete and the airport is in a licensing and trial-flight phase, with operations expected to begin in 2026. Verify the latest notice before planning travel. Source

What is the Dholera to Ahmedabad distance and travel time?

The Ahmedabad-Dholera Expressway runs about 109 km and is designed to cut the drive to roughly 40 to 60 minutes, down from the older two-to-three-hour route. Source

What is the Tata semiconductor plant in Dholera?

It is India's first commercial semiconductor fab, being built by Tata Electronics with PSMC of Taiwan. It is a 300mm fab with a planned capacity reported at about 50,000 wafers per month on roughly 28nm to 110nm nodes, at a reported investment of around Rs 91,000 crore. Source

When will the Tata chip fab start production?

Construction began in 2024 and the fab is reported roughly half-complete in 2026, moving into cleanroom and equipment installation. Trial production is planned in the 2026-2027 window, with commercial output ramping afterward. These are reported timelines and can shift. Source

Who is building and operating Dholera airport?

It is being developed by Dholera International Airport Company Limited, reported as a joint venture led by the Airports Authority of India with the Government of Gujarat and NICDIT. Source

How big is Dholera SIR?

Dholera SIR is planned across roughly 920 sq km of Dholera taluka. Early development is concentrated in an Activation Area reported at about 22.5 sq km, where trunk infrastructure and anchor projects are being built first. Source

What is DICDL and how does it relate to DMIC?

Dholera is the flagship node of the Delhi-Mumbai Industrial Corridor (DMIC). It is implemented by Dholera Industrial City Development Limited (DICDL), a special-purpose vehicle formed between the central DMIC trust and the Gujarat state authority (DSIRDA). Source

Is there a metro or train to Dholera?

A metro/MRTS corridor between Ahmedabad and Dholera is planned within the same corridor as the expressway. Separately, a Bhimnath-Dholera rail line of about 23 km is reported sanctioned, linking the SIR to the Western Dedicated Freight Corridor. Both are under planning or early works, not yet running. Source

How big is the Dholera Solar Park?

It is an ultra-mega solar project planned to scale toward roughly 5,000 MW by around 2030. A 300 MW Tata Power Renewable Energy phase has been operational since 2022. Source

Is the Ahmedabad-Dholera Expressway open?

The expressway is reported operational in 2026. It is built four-lane, designed to expand to eight lanes, and developed by NHAI, connecting the Sardar Patel Ring Road near Sarkhej to Dholera SIR. Source

What is the ABCD building in Dholera?

The ABCD (Administrative and Business Centre for Dholera) building, reported at about 14,000 sq m of built-up space, houses government offices and investor-facilitation services and anchors the planned central business district. Source

How can I check the status or costs of a Dholera plot myself?

Use our free, independent Dholera tools and calculators to estimate costs, and see verified government schemes and authorities before you rely on any figure. AskDholera does not sell plots.

Keep exploring

Run the numbers with our free Dholera calculators and tools, check official policy on the Government & schemes page, or start from the AskDholera home guide. Have a specific question? Ask the AI assistant.